Healey Mills

The 1980's and the beginning of the end?   

When British Rail launched Speedlink (their air-braked wagonload network) in 1975, Healey Mills was one of twelve yards across the network where traffic could be swapped and interchanged. However, Speedlink was withdrawn from Healey Mills just ten years later in 1985.

The hump was closed in 1984 when average loads over it were 100 wagons per day, well below the 4,000 it was designed for. Much of the coal traffic that went through, or passed by the yard, was marshalled into merry-go-round (MGR) trains and so did not need shunting or marshalling. 

Placeholder Picture

Coupled with this, the closure of Yorkshire coal mines in the 1980s meant that the traffic through the yard had dwindled.

 By 1985, the yard could not be accessed directly from the west; the hump and reception sidings were closed and lifted. Traffic arriving from the Calder Valley or Standedge lines, would need to reverse in the departure sidings on the east end side of the yard. 

Allocation of locomotives at Healey Mills numbered 77 by 1982 and composed of classes 03, 08, 37, 40, 47 and class 56, though the class 56 locomotives were only allocated to the depot for two years.

Under TOPS, the depot code was HM.

 Due to the loss of traffic and the closure of the hump yard, the depot was downgraded from a traction maintenance depot (TMD) into a traction servicing depot.

It lost its allocation of mainline locomotives, which were shared between Gateshead, Immingham, March, Stratford, Tinsley and Thornaby, and its shunters were sent to Leeds Holbeck.

Placeholder Picture

After the marshalling yard closed in 1987, the site was used for storage of trains and locomotives. After the privatisation of British Rail the site was operated by EWS; an assessment was made of a future requirement of six long doubled ended sidings and further short single ended sidings.

In 1993, Trainload Petroleum reopened the depot at Healey Mills, though this was short-lived, and was only used for fuelling and minor maintenance of locomotives.  

However, it saw a small resurgence when the pre-privatised freight companies launched a wagonload service in the early 1990s. 

It lost its marshalling responsibilities again in May 1998, when Doncaster Belmont yard superseded Healey Mills as the gathering point and hub for Yorkshire. Doncaster Belmont's position on the East Coast Main Line meant that it was geographically and strategically better placed to handle the wagonload traffic (now branded as Enterprise under EWS ownership). 

The signing on point for traincrew was closed in February 2012 when it was transferred to some portacabins near to Wakefield Kirkgate railway station. 

The depot buildings were demolished in 2016 and most of the track has been removed.

 In February 2017  redundant carriages and track were used in a crash exercise using railway staff and the emergency services.